McCrary
Construction Services has been providing Northeast Mississippi
with quality concrete pumping services since 1986. With offices
in Columbus, MS and Tupelo, MS, this family owned business can
easily and quickly access any jobsite needs that you may have.
With our fleet of state-of-the-art line and boom concrete pumps,
McCrary Construction Services can service all of your concrete
pumping needs. By offering Schwing's leading-edge technology and
reliable service, we have a service record parallel to none. We
would like to thank our customers for allowing us to to
participate in many successful and challenging projects.
McCrary Construction's jobs include everything from residential
patios to large scale power plants. We also have experience
on airports, bridges, and
any size commercial projects such as the new Severcorr
Steel Mill - Columbus, MS, The
Steel Dust Recycling Center - Millport,AL, Kinder
Morgan Terminal - Columbus, MS, and the Toyota
Highlander Production Plant - Blue Springs, MS.
Current
Events
April
2009
McCrary
Construction Services is now a dealer of Alfra
Tools. We will be stocking and selling
items
like: Magnetic Metal Core Drilling Machines, Metal Cutting Saws,
Super Dry Cut Saws,
and
Cutting Bits & Blades. Please contact Lu
by email or at
662-244-3424 for any questions or sales.
August-September
2008 McCrary Construction Services Puts Safety
1st
McCrary
Construction Services now employs the safety expertise of Professional
Safety Services of Flowood, MS. Professional Safety Services
provides safety consulting directly with commercial, industrial,
manufacturing and construction customers. They have designed
their services to meet our specific needs. Safety services are
offered for employee and worker loss control, vehicular safety, the
prevention of accidents for customers, guests and visitors to
business premises. They evaluate the effectiveness of fire
protection systems and review evacuation plans. They also
design safety presentations to accomplish specific needs of their
customers and to comply with regulatory standards. Their loss
source approach targets specific areas of focus and directs
resources toward client objectives for safety and accident
prevention. Their results are reflected in the reduction of
accident costs and in the loss reports for our company. Professional
Safety Services has developed and implemented safety programs that
identify controls required for our specific hazards in the
workplace. At McCrary Construction Services, we are making
every effort to be ahead of the game and our competitors when it
comes to safety.
May
2008 Thanks to Fairview
Baptist Church in Columbus, MS for allowing us to be a part of
their new Youth Complex.
April
17,2008 McCrary Construction Services add Schwing
S31 EZ boom to fleet to service the growing request for specialty
pours!
McCrary
Construction Services introduces the Schwing
S31 EZ boom to its fleet. The telescoping boom versatility
combines with operational ease to provide maximum utilization with
the new S 31 HT. This is the concrete pump that is really two
machines in one. In low overhead situations the boom needs only
18'9" unfolding clearance to provide 87-feet of horizontal
reach. The 15'2" of smooth telescoping action
with Auto-Scissors pipeline allows the operator to keep the boom in
the operational zone and utilize 545 degrees of slewing action to
keep the end hose above the pour and cover a wide area. The boom
utilizes a patented method of extending the pipeline as the boom
telescopes. With this method, the pipeline extension does not affect
overall height when using the telescoping first section.
On
conventional pours the telescoping action provides precise placement
in wall forms and ICF forms. When pouring in front of a laser
screed, the telescoping action is particularly convenient with its
simple forward and back one level joystick motion that does not
affect end hose height.
When
placing inside the second level, simply point and shoot - the
telescoping action gives added confidence to operators when they
boom in with one lever motion. No need to adjust multiple boom
sections or rely on complicated boom position sensors to stay within
the operating zone - one lever motion does it all.
Backing
up this smooth boom operation is the Generation III pump kit with up
to 170 cu.yds/hr. output available. This is the most refined pumping
system available with quiet, smooth operation at all speeds. The
twin cylinder pumping cylinders are sequenced by the exclusive
Schwing Rock Valve - the most popular valve used today with the
lowest cost per yard in maintenance costs.
April
1,2008
Don't
forget to check out our Equipment for
sale page! Currently we have a U-Cart AT 1.25 for sale!
check
back periodically for more equipment for sale. You may always
contact Lu McCrary
with more questions.
March
6, 2008 Congratulations to Kinder Morgan
We
would like to welcome Kinder Morgan to Columbus. Kinder Morgan is
one of the companies supporting the Severcorr Steel Mill. They
opened this month and are operating a new port on the west bank of
the Tenn-Tom Waterway in Lowndes County. They are one of the
nation's largest port operators. Phillips
Contracting completed most of the construction on the new port
facility. A special thanks to Stuart Phillips for the below photo.
March
3,2008 We've Moved!
We
have moved our office. Please stop by and see us at 3502
Jeff Homan Boulevard in Tupelo, MS. Our new telephone number
is 662-844-7255 and fax: 662-844-7260. We look forward to serving
our customers from a new location.
January
22,2008 Specialty
Pour, Millport,AL
Below
are photos of a 33-hour pour done on January 22-23, 2008. Both the
Schwing 34M and Schwing 41M were used to pump the 1,300 yards. The
Steel Dust Recycling Company wanted the concrete poured slowly to
avoid generating too much heat which in turn would compromise the
structural soundness of the concrete. We poured 40 yards an hour
per their request and completed the pour in 33 hours.
December
2007 - Happy Holidays to our
friends and customers!
November
2007 - SeverCorr releases a video
plant tour
America’s newest steel mill is up and running! Because so many
people want to take a tour of this brand-new facility, they have
created a “virtual tour” on video. Congratulations Severcorr!
Glad we could be a small part in the construction of this addition
to our local economy. Click on video below for a tour of this magnificent
facility.
July
2007 - McCrary Construction Services now
offers the services of core drilling and concrete slab sawing. We
are expanding our services to better fit the needs of all our
customers. Please give us a call today and let us saw for you!
March
2007 - McCrary-West Construction with the help of pumps
from McCrary Construction Services completes first and second
floor pours for the first two story climate controlled warehouse
in Columbus, MS built by Clyde Hollis, owner of Rent
- A - Space. Please view second floor pours made by MCS and
finished with several screeds. Please see slide show of 2nd story
pour using Schwing 28M and booming in through 2nd floor opening.
January
2007- McCrary Construction Services Adds
Bigger Boom to Growing Fleet to Better Service Clients with Larger
Pours
McCrary
Construction Services introduces the new Schwing
41SX boom to its growing fleet. Enjoy the benefits of the
longest boom on three axles with the new S 41 SX. With a
horizontal reach of 120 feet, vertical reach of over 132 feet and
740 degree boom rotation, the S 41 SX was designed with operators
and owners in mind. The S 41 SX features Schwing’s Super X
outriggers with a curved design that telescope out for fast,
compact set-up. The 4-section Roll and Fold™ Boom is the proven
Schwing design that is versatile enough for commercial and
residential projects. The new Vector Control System is standard
and allows two-way communication between the pump and operator.
Please click here to download new specs
for Schwing 41SX boom.